COMPLETED PROJECTS

TRANSMISSION LINES
  • OHTL  400 kV Bulgaria – Turkey
  • OHTL 400 кV Ruen – Bulgaria – Macedonia
  • OHTL 400 kV Zornitza
  • OHTL 220 KV Mednikarovo
  • OHTL 110 кV Chargan
  • OHTL 110 KV Kaloyanovo
  • OHTL 110 KV from s/s “Yambol” to s/s ”Sila” and from s/s “Sila” to s/s”Yambol-Center”
  • OHTL 110 KV from s/s “Yambol Center” to s/s “Kabile”
  • OHTL 220 кV Kamchiya – emergency reconstruction
  • Rehabilitation of the 110 kV overhead line “Konevets”
  • Reconstruction of OHTL 400,110 и 20кV, Тelephone and Optical lines during the construction of Highway Trakiya LOT 5 Burgas – Karnobat
SUBSTATIONS
  • Substation 110/20 kV Yambol 1
  • Substation 110/20/10 kV Yambol Center
  • Substation 110/20 kV Sunny Beach
  • Substation 110/20/10 KV Topolovgrad
  • Substation 110/20/10 KV Elhovo
  • Substation 110/20/6 kV Georgi Mihailov
  • Outdoor Switch Yard 110 кV HPS Kardjali
  • Substation 110/20 kV Burgas Industry
SOLAR PARKS
  • 4MW Solar park Bezmer
  • 5MW Solar park Elhovo
  • 10MW Solar park Dabovo
  • 25MW Solar park Cherganovo
HIGHWAYS
  • AM TRAKIA LOT 5 BURGAS-KARNOBAT – Reconstruction of Aerial lines 20kV, 110kV, 400kV and cable lines
  • AM TRAKIA LOT 2 STARA ZAGORA – NOVA ZAGORA – Reconstruction of Aerial lines 20kV and cable lines
  • AM STRUMA LOT 1 DOLNA DIKANYA – DUPNITZA – Reconstruction of aerial lines 20kV
CATENARY LINES
  • Reconstruction of catenary line between Zavoy Station and Zimnitza station
  • Reconstruction of catenary line in connection with the construction of Montana ring road